BACKGROUND
Northern Link is a proposed major underground toll road which will connect the Brisbane Western Freeway, to the Inner City Bypass Clem 7 and the Airport Link tunnel. It is a part of the Brisbane City Council's TransApex project. The TransApex project is designed to cater for the expected traffic growth within Brisbane's CBD.
WHAT WE DID
Geotechnical investigation was required to obtain data on the solid geology vital in the design and selection of the proposed tunnel and is route.
ClientBrisbane City Council
DurationTwo months spread over two years of work have been completed.
LocationBoreholes were completed along the proposed route, within restricted urban roadways.
DrillingTechnical Facilitation
Deep core holes to a depth of 60-90 metres;
Night works due to traffic and site restrictions;
Grout backfilling of borehole on alignment;
Complex geotechnical engineering insitu rock testing;
Installation of Geotechnical Instrumentation.
OUTCOME
"As a result of the investigation the project was deemed feasible and progressed to contract stage, with construction to commence late 2011."
Gary Bruyeres | Brisbane City Council, Senior Engineer
 
Geotechnical Drillinh Services Menu Heading
Link to Drilling Types page
Link to Drilling Infrastructure page
link to Drilling Resources page
link to Drilling Government page
Link to Drilling property page
 
 
spacer
 
© 2010 Schneider Drilling Pty Ltd